Why Did My Video Quote Go Up?

Budgets and Quotes · Reviewed by Matt Smolen · Last reviewed

Because the new detail changed the job. A quote prices the production as it was described at the time. When the brief adds locations, longer ads, more people speaking on camera or stills alongside the video, each of those adds time, crew or days. A good production company names every change and what it does to the cost before the new number arrives, and offers ways to bring it back down.

Key Facts

  • Most rises come from more locations, longer running times, more people with lines, or extra deliverables such as stills.
  • Stills and video often need the same daylight, so adding stills to a location shoot can add a day.
  • Repackaging the schedule can cut the cost of the same work, for example two full days and two half days instead of one full day and four half days.
  • We raise a likely cost change in conversation before it appears in a document.

What Usually Makes a Quote Go Up?

New detail that adds time, people or places. On one TV campaign we quoted, the brief moved from 15-second ads to 30-second scenarios, background extras became people with lines, a generic setting became a specific branded one, and stills were added to the video. Each of those is a cost on its own. How each one is priced is in what goes into a video production quote.

Stills are the one people most often underestimate. Outdoors, video and stills compete for the same good light, so the day stretches or splits into two.

Is It Fair for a Quote to Change?

Yes, when the job has changed. A quote prices what was described at the time, and new detail often reveals more work. If nothing has changed, it shouldn't move, and you're entitled to ask what has. Either way, you shouldn't feel penalised for clarifying what you need.

How Should a Production Company Explain a Price Rise?

Line by line, before you see the number. A good explanation covers five things.

  • Each change named and costed. "The second location adds half a day", rather than only a new total.
  • A comparison you can check. A similar past job, and what it took.
  • The new total and the difference. Some clients need the full figure to set budget aside in one go.
  • Ways to bring it back down. A list of compromises you can pick from.
  • A heads-up first. The likely change raised in conversation before it lands in a document.

I thought I'd flag that before attaching pricing to it.

Matt Smolen, Director, Balloon Tree Productions

On bigger jobs we send the revised quote with a short recorded walkthrough, so you can see why it costs what it costs before we talk.

How Do You Bring the Number Back Down?

Look for the changes that add the most and ask whether each one earns its place.

  • Combine locations. Filming two places on one day usually costs less than two separate half days.
  • Repackage the schedule. The same shoots arranged as fewer, fuller days can cost less.
  • Keep lines to the people who need them. Not everyone on camera has to speak.
  • Separate or drop the stills. Or ask for frames taken from the video instead.
  • Trim the versions. Fewer cutdowns and formats now, more later if the first ones work.
  • Stage it. Make the main film now and add the rest in a second phase.

Should You Lock the List of Videos Before the Shoot?

Not always. When you're filming several real people, you can quote the capture of every story first and decide which ads to cut once you've seen the footage. That way you aren't paying for spots built around a story that turned out weaker on camera.

What If You Change Direction Just Before the Shoot?

It's usually smaller than it feels, as long as the date and the crew stay put. The visible cost is reworking the piece that changed. The hidden one is the work beside it: supporting videos with a thin brief tend to get neglected while everyone focuses on the change, so give them a clear brief of their own. If the change adds crew, a good production company names it as a change in scope and costs it plainly.

When Should You Push Back?

When you can't see what changed. Ask the production company to show the original assumptions next to the new ones. If they can't point to a difference in time, people or places, the quote shouldn't have moved.

Can a quote go up after I've signed it?

Only if the job changes after you've signed. A good production company agrees any change and its price with you before doing the extra work, so nothing arrives as a surprise on the invoice.

How do I avoid surprises in the first place?

Send everything you know early, including the run sheet, the locations, who's on camera and every deliverable and format you'll need. Then ask what the quote assumes, so you can see what would change it.

Is it cheaper to add things later?

Usually not. A second location on the same day, or stills captured on the same shoot, cost less than coming back for them.

Ready to Make Something Worth Watching?

Get a SAME DAY quote

You'll hear back the same business day. Or call (03) 9071 3070.